quote rfraser:

Shipping from the Cleveland Foundry could be up to 2 weeks or more; then moved from the entry dock in England to Jensen would take more time; then there is unloading, unpacking, some assembly maybe required and then placed in the Q to go to install assembly, all time consuming and variable.
My best guess right now on very limited information is 4 months; the time frame for my Tiger ‘s engine was 6 months so the time frame is also variable.

More information is needed for all Engine Groups to answer this type of questions.
Ron Fraser

I was thinking that the "delay" would be significant between Cleveland and final assy… that is a lot distance (and thus time via ship) plus a lot of logistical steps along the way.
Hopefully you’ll be able to gather more data and things will be more clear as time goes on.
Thanks again.
Mark